Skip to content

Menu

Article 4 direction checker

Enter a postcode to see whether an Article 4 direction applies, which permitted development rights it removes, and the council’s direction document. It is free and uses the directions councils have published to planning.data.gov.uk.

  • Free, no sign-up
  • Official government data
  • Ten checks in one
Groundwork

England only. Free, no account needed. After the first check you can drag the pin onto the exact house.

One check, ten designations

What Groundwork checks

  • Tree preservation orders

    Trees here are protected by a tree preservation order. You need the council’s consent before you cut down, top, lop, uproot or wilfully damage them, and breaking an order can lead to an unlimited fine.

  • Conservation area

    This point is in a conservation area. Some work that is usually permitted development needs planning permission here, demolishing most buildings needs permission, and you must give the council six weeks’ notice before working on a tree with a trunk over 7.5 cm across.

  • Listed buildings

    This building appears to be on the National Heritage List for England. Listed building consent is needed for any work that affects its character, inside or out, including some repairs, in addition to any planning permission.

  • Article 4 direction

    An Article 4 direction applies here: it removes some permitted development rights, so work that normally needs no planning application does need one. The rights it removes are listed below.

  • Scheduled monument

    This point is on a scheduled monument. Almost any work here, including digging, needs scheduled monument consent, applied for through Historic England.

  • World Heritage Site

    This point is in a World Heritage Site. Planning decisions here must protect the site’s outstanding universal value, so expect applications to be looked at closely.

  • Registered park or garden

    This point is in a registered historic park or garden. The council must consider its special historic interest when deciding planning applications here.

  • National park

    This point is in a national park. The national park authority is the planning authority, and permitted development rights for some extensions, cladding and dormers are tighter than elsewhere.

  • National Landscape (AONB)

    This point is in a National Landscape, formerly an Area of Outstanding Natural Beauty. Some permitted development rights are reduced, and major development is only allowed in exceptional circumstances.

  • Green belt

    This point is in the green belt. New buildings are normally inappropriate development unless they fit an exception in national policy, and extensions must not be disproportionate to the original building.

FAQ

Frequently asked questions

Something else? Write to groundwork@niamori.ai.

What is an Article 4 direction?

A council order under Article 4 of the General Permitted Development Order that removes some permitted development rights in an area, so work that normally needs no planning application, such as turning a house into a small HMO or replacing front windows in a conservation area, needs one.

Does Article 4 affect a house I am buying?

It can: an Article 4 direction on HMOs stops a family house becoming a shared house without permission, and one on alterations can mean you need permission for new windows, doors or a porch. Check before you buy if you plan changes.

Where does the data come from, and is it complete?

From planning.data.gov.uk, where councils, Historic England and Natural England publish planning data under the Open Government Licence. Listed buildings, scheduled monuments, national parks, National Landscapes and the green belt cover all of England. Tree preservation orders, Article 4 directions and some conservation areas are published by each council, and not every council has published yet: when yours has not, the result says so instead of showing “none found”.

How much does it cost?

Checking an address is free and needs no account. Pro is US$9 a month for a downloadable PDF report of each address and batch checks of up to 100 postcodes, with a full refund within 14 days of each payment.

Can I rely on the result for a planning application?

Use it to find out what to ask about. It is not legal advice: designations change, council data can lag, and boundaries are drawn by people. Before you start work, confirm with the local planning authority, which Groundwork names in every result.

Know the restrictions before you buy, build or prune

Checking an address is free. Pro is US$9 a month for PDF reports and batch checks.